Dubai Health Care City

Project Highlights

  • 4 Nos. Fresh Air Handling Units
  • 10 Nos. Recirculating Air Handling Units
  • 12 Nos. Secondary Chilled Water Pumps
  • 1 Set Fire Pumps, Jockey, Main Electric and Diesel
  • 534 Nos. Fan-Powered Variable Air Volume Units
  • Central Battery Emergency Lighting System
  • 55 Nos. Fan Coil Units
  • 5 Nos. Carpark Extract Fans
  • 1 Set Main Water Transfer Pumps
  • 4 Nos. GRP Water Tanks
  • 10 Sets Water Booster Pumps
  • 6 Nos. Main Distribution Boards
  • 1 No. 1500 kva Generator
  • Building and Fa├žade Lighting System
  • Lighting Control System
  • Fire Alarm System
  • Building Management System