Jumeirah Islands

Project Highlights

  • 4 Nos. X 2250 TR Capacity
  • 8 Nos. Primary CHW Pumpsets
  • 8 Nos. Secondary CHW Pumpsets
  • 8 Nos. Cooling Towers
  • 2 Nos. Air Separators
  • 4 Nos. Expansion Tanks
  • 16 Nos. VFDS
  • Automatic Chemical Dosing System
  • Cooling Tower Make up water pumps
  • 600 Meters of Pipe lines inside plant room
  • 8 Nos. 2000 kVA Transformers
  • HV Switchgear
  • LT Panels & Switchgear
  • Fire Alarm,Fire Fighting & FM 200 System
  • Integrated Building Management System
  • Lighting and Power Distribution System
  • Emergency Lighting System
  • Integrated Building Management System
  • Lighting and Power Distribution System
  • Emergency Lighting System
  • Potable Water
  • 60 KM of Burried CHW piping with leak detection system