The Garden Residential Complex

Project Highlights

  • 31 Kilometers of buried insulated chilled water piping with Leak Detection System
  • 13 nos. chillers each of 1300 TR Capacity totaling to 16,900 TR Capacity
  • 10 nos. Secondary Chilled Water Distribution Pump-sets with VFD
  • 2 Sets of Water Ozone System for Condenser Water Purification
  • Supervisory Control And Data Acquisition System (SCADA) for Plant room
  • 13 nos. Primary Chilled Water pump-sets
  • 13 nos. Condenser Water Pump-sets
  • 13 nos. Cooling Towers
  • 13 nos. Sediment Separators
  • 13 nos. 2000 KVA Transformers
  • HT Switch-gears
  • LT Panels and Switch-gears
  • 4 nos. Expansion Tanks.
  • 2 nos. Air Separators
  • Chemical Dosing System
  • Fire Alarm & Fire Fighting System
  • Power Distribution System
  • Emergency Power Distribution System
  • Lighting Systems
  • Emergency Lighting System
  • Cooling Tower make up pumping system